Route 93 Bridge, Road Work October 11-14

Route 93 Medford

The following lane closures are scheduled to occur Tuesday, October 11-Friday, October 14:

Route I-93 Northbound

– Alternating double left or double right lane closures between Exit 29 (Routes 28/38) and Exit 34 (Route 28 North) on Tuesday, October 11 through Friday, October 14 between 8 PM and 5 AM.

– Alternating single left or right lane closure between Exit 29 (Route 28/38) and Exit 34 (Route 28 North) on Tuesday, October 11 through Thursday, October 13 between 9 AM and 2 PM and on Friday, October 14 between 9 AM and 12 PM.

Route I-93 Southbound

– Alternating double left or double right lane closures between Exit 35 (Winchester Highlands) and Exit 28 (Sullivan Square) on Tuesday, October 11 through Friday, October 14 between 8 PM and 5 AM.

– Alternating single left or right lane closures between Exit 35 (Winchester Highlands) and Exit 28 (Sullivan Square) on Tuesday, October 11 through Thursday, October 13 between 10 AM and 3 PM and on Friday, October 14 between 10 AM and 12 PM.

Local Roadways & Waterways

Salem Street/Route 60 (East and West)

– Periodic single lane or shoulder closures on Tuesday, October 11 between 7 AM and 5 PM. Provisions for pedestrian access will be maintained.

Mystic River

– Barge placement and periodic movement within the Mystic River will reduce the navigable channel on Friday, October 7 through Friday, October 14.

Route 16

– Periodic single lane or shoulder closures on Tuesday, October 11 through Friday, October 14 between 7 AM and 5 PM. Provisions for pedestrian access will be maintained.

MassDOT encourages drivers and marine traffic to allow extra time for their trips and to reduce speed and use caution when traveling through or adjacent to all work zones.

For more information or to sign up to receive future updates and schedule information, visit the project’s website at www.mass.gov/massdot/93fast14.

– Information from MassDOT